News

 
 

 
DateDevin News
10/29/2007DEVIN eliminates elevator bails in improved coiled tubing lift frame
 An improved coiled tubing lift frame engineered by DEVIN International, built to reduce rig up height for well completions and interventions, is shown to be commercially viable and effective on a deepwater drilling vessel in the Gulf of Mexico. DEVIN’s solution – called a dual articulating lift frame (DALF) – shortens rig up height by 12 to 18 feet and cuts rig up time in half.
8/30/2007 DEVIN eliminates elevator bails in improved coiled tubing lift frame
 An improved coiled tubing lift frame engineered by DEVIN International, built to reduce rig up height for well completions and interventions, is shown to be commercially viable and effective on a deepwater drilling vessel in the Gulf of Mexico. 
3/26/2007 DEVIN aligns with DeepBlue Technologies for complete landing string solution
 Lafayette, La.-based DEVIN International and Houston-based newcomer DeepBlue Technologies are partnering on a complete landing string solution for an underserved portion of the deepwater completions market.
1/5/2007 DEVIN Introduces Dual Compensating Intervention Tower
 DEVIN International introduces to the oil & gas market an innovative and modular motion-compensation tower that adapts to any type of vessel, platform or rig that is experiencing motion during the well intervention stage.
06/14/2006DEVIN Introduces New Break Out / Make Up Services
 Due to an ever-growing demand for safer alternatives, DEVIN has introduced Break Out / Make Up services. These services can be performed at the DEVIN Lafayette facility or, for larger jobs, at your location.

   
 

 

Home  |  Site Map  |  Search Site  |  Products  |  Services  |  Company Profile  |  News  |  Locations/Contacts

© Copyright 2008, Devin Tools. All rights reserved.