|
The DEVIN Coil Tubing Lift Frame was designed to improve the performance of coil tubing, logging, or snubbing services, while working offshore from a drill ship or semi-submersible drilling rig. The DEVIN lifting frame is designed to provide a motion compensated connection onto which the injector head, wireline sheave, snubbing stack, as well as pressure control equipment, can be deployed. Each structure is fitted with a 25 Ton Winch and an Electronic Dynamometer with remote.
The DEVIN unit has the ability to articulate for easier access to the well area and handling in the derrick.
The DEVIN 750 Ton Coil Tubing Lift Frame offers a safer more economic option for deep water service.
Purpose:
-
Allows service equipment (i.e. coiled tubing, logging, snubbing) to work from the motion compensator of the rig when working on drill ships, floaters and semi-submersibles.
-
Keeps service equipment aligned with crown block and work string (i.e. drill pipe, production tubing, etc.)
-
Allows for a safe work area around the injector head with 2 adjustable work platforms.
-
25 ton winch allows easy handling of support equipment.
-
Articulates for easy access through the V-door.
-
Safer, more economic option for deep water service.
-
Load Cell allows for accurate reading of service equipment weight up to 50k.
-
Frame rated to handle 1500k string weight.
Supplemental Equipment:
|
|
750 Ton Coil Tubing Lift Frame
Height, outside 53 ft. Height, inside 36 ft. Width, inside 81" or 102" Width, outside 111" or 132" Frame Weight 55,000 Lbs. Max Winch Capacity 50,000 Lbs. 6-5/8" Lift Sub | |